BitTorrent (BTTC) Bridge Phased Shutdown: Check Asset Migration Schedule

Konam

@konam

BitTorrent has announced a phased shutdown of its BTTC bridge service. If you hold assets, please check the deadlines promptly to avoid any potential loss.

According to the released schedule, deposit services will be terminated first on June 13, followed by a complete cessation of withdrawal services on June 18.

As a result, holders of assets such as TRX_e or TRX_b on the Ethereum or BNB Smart Chain (BSC) networks must migrate or move their assets to a safe location before the deadline to prevent the risk of asset loss.

This service termination is reportedly not affecting the core BTTC network operations, but manual action is required for assets linked to the bridge. If you hold relevant assets, please refer to the official guide and complete the necessary steps by the deadline.

No comments yet.