An NHS Exit Plan Is a Rehearsal, Not a Document
On 16 November 2026, health minister James Frith told the Commons that the NHS Federated Data Platform (FDP) contract with Palantir will run until March 2029, skipping its February 2027 break clause. Replacement procurement starts in January 2027 and should take around 18 months, leaving under a year for the switch. The FDP is live in 142 hospital trusts. The question is not whether the NHS owns its data — ministers say it does — but whether it can move that data, its applications, its permissions and its clinical workflows to another supplier without patients noticing.
1. Data portability: ownership is not the same as movability.
Awarded in November 2023 to a Palantir-led consortium, the FDP has a ceiling of £330 million over a maximum seven-year term; the £182.2 million award-notice figure is not committed. Ministers confirm the platform, NHS-funded intellectual property and data are NHS-owned, with UK storage required, and that exit provisions transfer data to a replacement. That is the easy half — the hard half is format and meaning. Data exported as a proprietary dump is portable in name only, so the plan must require export in open, structured, machine-readable form against the NHS's own standards — UK Core FHIR R4, mandated for health and care in England since 2022 — and it must cover derived data, not just raw records. One legal trap: the UK GDPR right to data portability (Article 20) applies only where processing rests on consent or a contract. NHS processing rests on public task, so that right does not apply — portability must be secured contractually.
2. Application compatibility: rebuild the workflows, not just the database.
The FDP is not a single database; it is a set of operational applications — theatre scheduling, bed management, discharge coordination. Schedule 8.5 already recognises this: the supplier must keep asset and subcontract registers and a configuration database, and exit information must let a third party bid without disadvantage against the incumbent. A safe plan turns that into a test: every live application mapped to its successor, every integration re-proven, every workflow re-validated with its clinicians. Denmark's Sundhedsplatformen — a DKK 2.8 billion Epic rollout — is the warning: years after go-live, routine clinical tasks still took longer and 32% of users remained dissatisfied. Compatibility is measured in minutes per task on a ward, not in API conformance certificates.
3. Access permissions and audit trails: revoke cleanly, keep the record.
An exit is also a security event. The plan needs a dated timetable for revoking the outgoing supplier's access — including subcontractors — with access limited to a time-bound transition, and every role and permission re-mapped, not copied across. The handover must also include monitoring logs and problem-resolution records, and the audit trail must survive the supplier — including corrections to records already shared. The contract already requires an initial exit plan within three months, annual review, a final plan six months before expiry, and termination services for up to 24 months plus a possible six-month extension. Those provisions are the floor, not the plan — the NHS must verify they were actually produced, reviewed and exercised.
4. Clinical continuity: parallel running with a rollback trigger.
Continuity is why the February 2027 break clause was not used — the minister judged that ending the contract then risked disrupting services. So the plan needs parallel running of old and new systems, a clinical safety case under the NHS's DCB0129/DCB0160 standards, and pre-agreed rollback criteria: defined thresholds — discharge-list accuracy, theatre-scheduling availability — below which the switch reverses. Norway's Helseplattformen, a NOK 3.7 billion Epic programme, drew clinician protests and warnings that it endangered patient safety. At Mass General Brigham in the US, an Epic migration reported at $1.2 billion reached $1.6 billion by 2018, with the software itself under $100 million. The money is mostly in the transition, and the transition is mostly clinical.
5. Independent testing: continuity tests are not migration tests.
Schedule 8.6 requires annual service-continuity tests supervised by NHS England, with results reported within 20 working days and retesting at no extra cost. Those tests cover business continuity, disaster recovery and insolvency — not whether data and workflows can move to another supplier. A safe plan adds an independent migration rehearsal: a defined workflow moved into a receiving environment, recording what transfers, what fails and who fixes it. Independent scrutiny matters because the FDP's own benefit claims have already failed it: the statistics regulator warned NHS England it had no evidence for a claim of 100,000-plus additional operations, and in November 2026 NHS England withdrew a claim that 137 trusts were benefiting after 29 trusts said the platform was not live.
Conclusion.
The Science, Innovation and Technology Committee's June 2026 report, Rewiring the state, called Palantir's growing presence an "unacceptable point of weakness" and urged a fully costed exit plan by the end of 2026. The government chose the bridge instead: two more years, then a new platform. That makes the exit plan more urgent, not less. A safe one verifies five things before the switch: data moving in open standards with derived meaning intact; applications re-proven workflow by workflow; access revoked on a dated timetable with the audit trail surviving; parallel running with a rollback trigger; and an independent migration rehearsal, not just the continuity tests the contract already requires. Anything less is not an exit plan. It is a hope that the next supplier will be more forgiving than the last.
Sources
https://questions-statements.parliament.uk/written-questions/detail/2026-05-20/3734 https://www.digitalhealth.net/2026/11/health-minister-confirms-palantirs-nhs-contract-to-end-in-2029/ https://www.securities.io/uk-government-keeps-palantir-on-nhs-data-platform-through-march-2029/ https://www.computerweekly.com/news/366643883/SIT-Committee-urges-Palantir-exit-in-push-to-end-US-cloud-grip https://www.linkedin.com/pulse/assurance-dial-stephen-hall-mv3we https://digital.nhs.uk/data-and-information/information-governance/guidance/information-governance-framework-shared-care-records/appendix-4 https://ico.org.uk/for-the-public/your-right-to-data-portability https://production-like.nhsd.io/binaries/content/assets/website-assets/isce/4020/4020332021isn.pdf https://packages.fhir.org/jurisdictions/gb https://pubmed.ncbi.nlm.nih.gov/36194994/ https://pmc.ncbi.nlm.nih.gov/articles/PMC13008087/ https://www.techi.com/palantir-nhs-contract-ends-2029-revenue-share/